Thursday, April 10, 2008

Vegtetative Up and Comings....

A lot is going on around here. 99% of the floor is finished. Last night we got what looks like an inch of snow, in contrast to the 60 degree days previous. Eight aspen were put in with the sweetest irrigation drip system I have ever seen. The plumbing inspector walked right in the front door like he owned the place, Im sure the look on both our faces was "hey, what are you doing here?" The theater system is tight and the cabinets are still empty. Im dreading the door jambs on the floor so bad it hurts. Later today if it warms up I may go and make a vegetative walkaround video. We shall see. And thanks to everybody for the rickrolling.


What the shit am I supposed to do here?

No furniture sucks....

4 comments:

Daniel said...

Plant grass inside to cover up the missing boards? Not such a bad idea when you see it done right, check it out: http://www.smouch.net/lol/

Manders said...

lose the shitty attitude, mortensen! ;)

DragonShrine said...

Lookin' good bro. I see Manders has a new picture. Anyways, you can still come and do my house too. ~LOL~ Take care bud.

Unknown said...

This is how the proper door jam is done. place 8-10 PBR cans in the door (as many as it takes to cover the opening) and then drink them when you are done the answer will be obvious!